Alexandra Park

  • Weight (Tonnes)

    2,800

  • Floor Area (m2)

    52,000

  • Height (m / stories)

    34 / 8

Our competitive advantage is threefold: lower costs, world class quality, and the ability to adapt and grow within a changing market.

Challenge Steel is working with Canam Construction and Ganellen Construction on the supply and fabrication of structural steel for the Auckland Trotting Club Inc., which is a harness racing club that has called Alexandra Park its home for 125 years and has over 750 members. This urban village project involves the construction of 246 high end residential apartments, two double level basement car parks and over 4,500 square metres of retail and commercial space.

The architects have focused on delivering exceptional design that makes a lasting contribution to the urban and natural context by challenging, provoking and delighting. The development is committed to a sustainable built environment. This project comprises three distinct buildings with construction of the first and second phases underway.

apliving.co.nz